Skip to main content
Usage measures what a project consumes. Billing records plan state and payment status. Quotas protect projects from exceeding plan or runtime limits.

What to watch

AreaWhy it matters
PlanControls available features and capacity.
UsageShows consumed runtime, storage, generated assets, or other metered resources.
CreditsTracks prepaid or included consumption.
LimitsBlocks or warns before a project exceeds allowed usage.
Check usage before relying on repeated work. Scheduled jobs, long agent runs, deployments, and integrations can spend quota repeatedly.